Click Here to Print Page | Download Packet


Technical Review Committee Agenda

May 31, 2012 at 02:00 PM

City Hall  (view map)
70 E. Monroe St
Franklin, IN 46131

MEETING AGENDA

The Technical Review Committee will meet at the Department of Planning & Economic Development Office Conference Room (third floor) to review the following:


  1. PC 2012-08 (SPR): KYB Headquarters Integration Project Applicant: Takenaka Corporation USA Location: 2575 & 2625 N. Morton Street Zoning: IG (Industrial: General), IL (Industrial: Light) & GW-OL (Gateway Overlay) Request: Site development plan review
    Documents: PC 2012-08 Construction Plans | PC 2012-08 Drainage Report

  2. PC 2012-09 (SPR): St. Rose Athletic Field Applicant: CKW Land Surveying, Inc. Location: 114 Lancelot Drive Zoning: IN (Institutional) Request: Site development plan review
    Documents: PC 2012-09 Construction Plans | PC 2012-09 Drainage Statement