    CITY OF FRANKLIN DEPARTMENT OF PLANNING & ENGINEERING 70 E. MONROE STREET > FRANKLIN, INDIANA 46131 > 877.736.3631 > FAX 317.736.5310 > www.franklin.in.gov/planning Fee Schedule Effective Date: November 1, 2009 Residential (Single Family...
Subscribe to this feed

 

Call before you dig: Homeowners can now call 811 instead of the full 800-382-5544 number.  For more information visit www.indiana811.org

 

To download a permit application click here.

 

When calling for an inspection, you must provide the permit number, lot number, the name of the subdivision and street address.  A control number will be issued when an inspection is properly scheduled.  (Retain this control number for you records - this number will allow the Department of Planning the track the inspection through our scheduling system.  It also provides reference for any scheduling changes that may need to be made.)
An inspection will not be scheduled unless the permit number is given at the time you request the inspection.

Permits MUST be posted on all job sites, and once windows are installed, the permit must be placed in a window, visible from the street.

An inspection will not be made if the permit is not accessible to the inspector.  Furthermore, a re-inspection fee of $25.00 will be charged anytime the inspector must return to the job site more than twice for any single type of inspection.

INSPECTION SCHEDULE

All building inspections must be scheduled with the Department of Planning & Economic Development at least one (1) business day before the inspection is to be conducted.  Inspections will not be scheduled for more than five (5) days in advance.  Footing inspections can be scheduled for a set time, but all other types of inspections are scheduled by the day.  The following is a list of required inspections for construction projects within the City of Franklin. 

 FOOTING:

The footing inspection must be completed after the trench is dug, but BEFORE concrete is poured.

 UNDERSLAB:

The underslab inspection must be completed after all the plumbing, electrical, and / or HVAC has been roughed but BEFORE the slab is poured.

 ROUGH-IN:

This inspection includes structural, electrical, and plumbing.  The inspection should take place after the roof, interior framing, exterior framing, plumbing lines are installed, all electrical boxes are set and wire is set BEFORE drywall and insulation is installed.

 INSULATION:

BEFORE drywall is hung.

 FINAL:

After all improvements have been installed, but BEFORE occupancy of the structure.

 

For sewer connection inspections, call the Department of Public Works at 317.736.3640